Project Objective

To provide a new eye hospital for NHS patients who require cataract surgery and YAG laser capsulotomy in Worcestershire.

The new hospital will help reduce waiting times for those requiring surgery to improve their vision, offering appointments to patients in just four to eight weeks, compared to a national target of 18 weeks.

The Process

Airology Systems were appointed to design and install the theatre and treatment room air handling systems.

After carrying out a detailed survey of the site and, in conjunction with SpaMedica’s requirements, we provided a complete design for the project.  The design included detailed layout drawings, encompassing duct work arrangements, refrigeration configurations, and positioning of essential equipment.

Following design approval, Airology’s Project Manager carried out a pre-start meeting with the client to discuss project commencement dates, lead times, and potential challenges.

Results

Airology had a 10-week programme to complete the installation works, conduct comprehensive testing, commissioning, and system validation, ensuring optimal functionality and performance.

On completion, the project was handed over to the client facilitating the transition to operational status.

Our client has benefited from: –

  • A state-of-the-art first-class facility
  • Being able to deliver rapid access to patients with referral to treatment time for cataract surgery in just four weeks.

Scope of works

  • Theatre Air Handling system
  • Theatre De-humidification system
  • Temperature control
  • Filtration
  • Extraction
  • Pressure stabilisation.
  • Treatment Room Air conditioning
  • Controls
  • Ductwork

Other Case Studies…

Paragraf, Somersham - ISO 6 & ISO 8 Cleanrooms

They required a GMP Grade B, C and D cleanroom facility with temperature control, filtration, pressure monitoring and ventilation.

Read case study

Xeal Pharma, ISO 7 Multiroom Cleanroom, Birmingham

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in pharmaceutical production and distribution, requested our recommendations.

Read case study

Blink Medical / Corsa Medical, ISO 7 Cleanrooms, Solihull

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to manufacture products in house and create a quality control office to maintain their high quality standards.

Read case study

Exstent Ltd, ISO 5, ISO 6 & ISO 7 cleanroom, Tewkesbury

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in personalised external aortic root support, requested our recommendations.

Read case study

Automotive, ISO 7 Cleanroom, Bolton

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanroom, Somerset

We were appointed to design and build a cleanroom facility along with quality review space to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Testcard, ISO 8 Cleanroom, Scarborough

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in at-home medical testing providing immediate test results at a low cost, requested our recommendations.

Read case study

Andel Plastics Ltd, ISO 8 Cleanroom, Birmingham

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist injection moulding and toolmaking company, requested our recommendations.

Read case study

Microsystems UK, ISO 7 Cleanroom, Warrington

Airology were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production and administration within their new premises.

Read case study

Trackwise, ISO 7 Cleanroom, Tewkesbury

We were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.

Read case study

Always Pure Organics, ISO 8 Cleanroom, Manchester

We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.

Read case study

Sheffield University, ISO 7 Cleanroom, Sheffield

Sheffield University required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

Read case study

Aerospace, Cleanroom Design, Somerset 2015

The client required an existing manufacturing space to be converted in an ISO 8 cleanroom facility with temperature control, filtration and pressure monitoring.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanrooms, Somerset 2020

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Spa Medica – Worcester

Airology Systems were appointed to design and install the air handling systems for theatre and treatment rooms at Spa Medica Eye Hospital in Worcester.

Read case study