Project Objective

With limited available space in their existing facility and an urgent need to expand to meet the demands of their research and development, our client, a University Department of Electronic and Electrical Engineering, requested our recommendations.

They required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

The Process

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to further their research and to maintain their high quality standards.

After surveying the area of their existing Lab, we worked with the client to ensure an efficient use of space to create the facility and with the capability for expansion in the future. Particular attention was given to the layout of rooms within the cleanroom facility to ensure all areas were the appropriate size for goods and trolleys passing in/out and make sure no areas would be unutilised.

Results

Working closely with the internal team and after the successful installation of the new ISO 7 cleanroom facility, our client has benefited from:-

  • The ability to carry out research within a clean area
  • A designated area to ensure all products meet high quality standards
  • Reduced costs as outsourcing has been decreased
  • The capability to expand research and development programmes

Scope of works

  • Wall Cladding
  • Plastic Curtain Enclosure
  • Ceiling
  • Floor
  • Filtration
  • Pressure monitoring
  • Commissioning /Validation
  • CDM – Principal Contractor/Designer

Project Value – £29,000.00

Other Case Studies…

Paragraf, Somersham - ISO 6 & ISO 8 Cleanrooms

They required a GMP Grade B, C and D cleanroom facility with temperature control, filtration, pressure monitoring and ventilation.

Read case study

Xeal Pharma, ISO 7 Multiroom Cleanroom, Birmingham

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in pharmaceutical production and distribution, requested our recommendations.

Read case study

Blink Medical / Corsa Medical, ISO 7 Cleanrooms, Solihull

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to manufacture products in house and create a quality control office to maintain their high quality standards.

Read case study

Exstent Ltd, ISO 5, ISO 6 & ISO 7 cleanroom, Tewkesbury

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in personalised external aortic root support, requested our recommendations.

Read case study

Automotive, ISO 7 Cleanroom, Bolton

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanroom, Somerset

We were appointed to design and build a cleanroom facility along with quality review space to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Testcard, ISO 8 Cleanroom, Scarborough

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in at-home medical testing providing immediate test results at a low cost, requested our recommendations.

Read case study

Andel Plastics Ltd, ISO 8 Cleanroom, Birmingham

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist injection moulding and toolmaking company, requested our recommendations.

Read case study

Microsystems UK, ISO 7 Cleanroom, Warrington

Airology were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production and administration within their new premises.

Read case study

Trackwise, ISO 7 Cleanroom, Tewkesbury

We were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.

Read case study

Always Pure Organics, ISO 8 Cleanroom, Manchester

We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.

Read case study

Sheffield University, ISO 7 Cleanroom, Sheffield

Sheffield University required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

Read case study

Aerospace, Cleanroom Design, Somerset 2015

The client required an existing manufacturing space to be converted in an ISO 8 cleanroom facility with temperature control, filtration and pressure monitoring.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanrooms, Somerset 2020

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Spa Medica – Worcester

Airology Systems were appointed to design and install the air handling systems for theatre and treatment rooms at Spa Medica Eye Hospital in Worcester.

Read case study