Project Objective

With an urgent need to expand to meet the demands of the industry, our client, a specialist in natural plant-based medicines and health products, requested our recommendations.

They required a Laboratory facility with temperature control to maintain product manufacturing conditions and ensure high quality standards. Along with admin and office space.

The Process

We were appointed to help design and build a laboratory facility to enable our client to store products in house to maintain their high quality standards and construct an office area for non lab staff.

After extensive surveying of the empty warehouse, we worked with the client to ensure an efficient use of space through the facility and with the capability for expansion in the future. Particular attention was given to the layout of rooms to ensure all areas were the appropriate size and to the overall aesthetic look of the facility as it would be a company showcase for their international customers and staff

Results

Working closely with the internal team and after the successful installation of the Lab and offices,  our client has benefited from:-

  • The ability to store and test products in house
  • A designated area to ensure all products meet high quality standards
  • Reduced costs as outsourcing has been decreased
  • The capability to grow the business and meet the growing demands of the industry

Scope of works

  • Walls
  • Ceiling
  • Floor
  • Electrical
  • Lighting
  • Mains Power
  • Air Conditioning
  • Glazing
  • Commissioning
  • CDM – Principal Contractor/Designer

Project Value – £330,000.00

“The Airology Team have been exemplary throughout the during of our project, acting as Principle Contractors taking an empty warehouse to fully functional office and licensed distribution facility for specialised medicines. Their technical knowledge was always detailed and informative and the work was executed with excellent project management skills, accommodating changes and tracking project progress to bring it to completion on time.”

Jaydon Inott
Head of Operations, Pharmaceutical Company

Other Case Studies…

Paragraf, Somersham - ISO 6 & ISO 8 Cleanrooms

They required a GMP Grade B, C and D cleanroom facility with temperature control, filtration, pressure monitoring and ventilation.

Read case study

Xeal Pharma, ISO 7 Multiroom Cleanroom, Birmingham

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in pharmaceutical production and distribution, requested our recommendations.

Read case study

Blink Medical / Corsa Medical, ISO 7 Cleanrooms, Solihull

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to manufacture products in house and create a quality control office to maintain their high quality standards.

Read case study

Exstent Ltd, ISO 5, ISO 6 & ISO 7 cleanroom, Tewkesbury

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in personalised external aortic root support, requested our recommendations.

Read case study

Automotive, ISO 7 Cleanroom, Bolton

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanroom, Somerset

We were appointed to design and build a cleanroom facility along with quality review space to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Testcard, ISO 8 Cleanroom, Scarborough

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in at-home medical testing providing immediate test results at a low cost, requested our recommendations.

Read case study

Andel Plastics Ltd, ISO 8 Cleanroom, Birmingham

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist injection moulding and toolmaking company, requested our recommendations.

Read case study

Microsystems UK, ISO 7 Cleanroom, Warrington

Airology were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production and administration within their new premises.

Read case study

Trackwise, ISO 7 Cleanroom, Tewkesbury

We were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.

Read case study

Always Pure Organics, ISO 8 Cleanroom, Manchester

We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.

Read case study

Sheffield University, ISO 7 Cleanroom, Sheffield

Sheffield University required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

Read case study

Aerospace, Cleanroom Design, Somerset 2015

The client required an existing manufacturing space to be converted in an ISO 8 cleanroom facility with temperature control, filtration and pressure monitoring.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanrooms, Somerset 2020

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Spa Medica – Worcester

Airology Systems were appointed to design and install the air handling systems for theatre and treatment rooms at Spa Medica Eye Hospital in Worcester.

Read case study