Project Objective
With limited available space in their existing facility and an urgent need to expand to meet the demands of the industry, our client, a specialist in CBD and wellness vitamins manufacturer, who had recently invested in a large empty warehouse space, requested our recommendations.
They required an ISO 8 cleanroom facility with temperature control and filtration to prevent contamination during manufacture, ensure high quality standards and efficient product flow.
The Process
We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.
After extensive surveying of the empty warehouse, we worked with the client to ensure an efficient flow of products through the facility and with the capability for expansion in the future. Particular attention was given to the layout of rooms within the cleanroom facility to ensure all areas were the appropriate size for goods and trolleys passing in/out and make sure no areas would be unutilised.
Results
Working closely with the internal team and after the successful installation of the new ISO 8 cleanroom facility, our client has benefited from:-
- The ability to produce products in house
- A designated area to ensure all products meet high quality standards
- Reduced costs as outsourcing has been decreased
- The capability to grow the business and meet the growing demands of the industry