Project Objective
With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in graphene-based electronic device development and process drives revolutionary technological advances in commercial applications, requested our recommendations.
They required an ISO 6 & ISO 8 cleanroom facility with temperature control, filtration, pressure monitoring, ventilation, and extraction to interface with their fume cabinets.
The Process
We were appointed to help design and build an ISO 6 & ISO 8 cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.
After extensive surveying of the empty warehouse space, we worked with the client and their representative over a number of months to finalise the layout/design that would ensure an efficient transition of their product in each stage of production and quality review. Particular attention was give to the integration of the compressed air, gas and water feeds for the client’s production machinery along with creating an efficient pressure cascade between each room.
Results
Working closely with the client representative and after successful installation of the new ISO 6 & 8 cleanroom facilities, our client has benefited from:-
- The ability to produce larger amounts of their products
- Designated room for their fume cupboards
- Designated yellow light room for specialist production
- The capability to grow their business and meet the growing demands of the industry